
18 Hangar 9 Sukhoi SU-26MM SE
Engine Installation (DA85)
Required Parts
Fuselage assembly 90-degree snap link
1/4-inch lock washer (4) 1/4-20 blind nut (4)
2mm lock nut
2mm x 10mm socket head screw
2mm x 4-40 ball end with hardware
Pushrod wire, 18
1
/
2
-inch (470mm)
1/4-20 x 3/4-inch socket head bolt (4)
Required Tools and Adhesives
Threadlock Drill
Pin drill Felt-tipped pen
Tape or spray adhesive Hobby knife
Rotary tool Sanding drum
Cut-off wheel
Drill bit: 3/32-inch (2.5mm), 5/16-inch (8mm)
The fuel vent line has been wrapped up and back around the
tank to stop the fuel tank from siphoning fuel during flight.
1. Secure the template (located on Page 31) for the
DA85 to the firewall using tape or spray adhesive.
Make sure to align the horizontal and vertical center
lines on the template with those on the firewall.
2. Use a drill and 3/32-inch (2.5mm) drill bit to drill the
four locations for mounting the engine.
3. Use the template to remove the area of the firewall to
allow the carburetor to extend into the engine box.
4. Mount the engine to the firewall using four 1/4-20
x 3/4-inch socket head bolts and four 1/4-inch lock
washers. Make sure to use threadlock on the bolts
as well as the lock washers to help keep them from
vibrating loose.
5. Attach the throttle linkage to the carburetor using
a 2mm x 4-40 ball link 2mm x 10mm socket head
screw and 2mm nut.
Commentaires sur ces manuels